Vestas · 2018–2019
Utility-scale ESS/EPC review
Structured sizing assumptions, interfaces, bidder responses, and risk ownership so technical gaps were visible before procurement and execution.
Review the EPC caseEngineering work
Employer-and-date case studies connect technical context to review methods while keeping confidential project information private.
Vestas · 2018–2019
Structured sizing assumptions, interfaces, bidder responses, and risk ownership so technical gaps were visible before procurement and execution.
Review the EPC caseTotalEnergies · 2019–2022
Connected acceptance criteria, FAT/SAT evidence, NCR status, commissioning records, and handover decisions through a repeatable traceability structure.
Review the QA/QC caseOpen delivery evidence
QA/QC and commissioning
Templates, policies, passing examples, and scripts connect requirements, FAT/SAT, evidence IDs, calibration, closeout, revisions, and acceptance.
Open the evidence-control toolkitGrid-storage operation
Executable references show how P, Q, voltage, frequency, ramp, temperature, energy, and reserve constraints change a request.
Open the grid-storage playbook